With industry and political focus remaining on the requirement to reduce waste to landfill in the construction process, Roadrock (UK) Ltd have simplified the process and ‘off sited’ the segregation process.

This is particularly useful on constricted sites.

All waste is segregated at a major licensed waste handling and recycling plant in the South East. Spreadsheet reports detailing the volume of each of the 17 recyclable waste streams that is contained in each consignment are issued with shipment notices a short time after skips and waste bins have been removed from site.